Description

Location: West Jordan, Utah

Project Type: Demolition of Existing Infrastructure, including Asbestos Abatement

Scope of Work:

This demolition project included the destruction and removal of a CVC Bay and Thyristor (or Switch) Control Building that contained asbestos.

Unique Problem Solved:

In order to ensure safety to the environment and our team, we followed the required work practices for the removal and disposal of the asbestos-containing materials as detailed in the OSHA Construction Standard for Asbestos (29 CFR 1926.1101). Due to the added safety measures, disposal procedures and required inspections, the project took significantly longer than other demolition projects. Despite this unique issue, we completed the project successfully.

TAKE THE NEXT STEP

Put Grade Tech Services to work on your next project. Contact us for more information or to request a bid.